© Copyright 2016 Tricorp Group, Inc. All rights Reserved

Florin Fashion Center

Sacramento CA 

New shopping center including two retail buildings with a total of 22,000 sf. of new shopping center and associated site work. The project also included 6,500 s.f. tenant improvement for the Oxford Street clothing store.

Westfield Solano Mall Renovation

Fairfield, CA

Complete interior renovation of public spaces in the existing mall; addition of 9 public bridges on the second level plus new monument entry signage at all mall entries. Project included renovation of 180,000 sf. of public space while keeping 71 existing stores open.

Hanlees Toyota of Davis

Davis, CA

Architect: RL Davidson, Inc.

 

45,021 sf new service center and sales and parts building.  Construction was phased to allow the business to remain open during construction.  The concrete block service center was constructed first, followed by demolition of the existing buildings and construction of the 2-story, metal stud and wood framed sales and parts building.  

 

Sears Entrance Renovation at          Westfield Galleria

Roseville, CA

Construction of two-story facade for the Sears store including entry storefront and finishes within an existing and operating mall.

Fresh N Easy

Sacramento/Elk Grove, CA*

Architect: KL Charles Architect

 

New 15,000 grocery store.  Scope includes building shell,

1 1/2 acres site work, refrigeration, gondolas, racking, and graphics.  Contractor will coordinate owner’s vendor

activities, including FF&E installation.  Project will be LEED Certified.

 

* Tricorp Group, Inc. has built two Fresh N Easys (Sacramento and Elk Grove locations). 

 
X
Password:
Wrong password.